We have a problem with the demo data for the report battle that Sandra from Sage found.
The Stock Replenishment report needs lead times per our spec. When I ran a lookup in the Demo Data of lead times, there are all zero. Looked at a couple POs and see that we have required dates and received dates so we should have a least the 'last lead time' even if we don't have a standard lead time. Is it just a bug with the upgrade to 2016?