Sage 100

 View Only
Expand all | Collapse all

Re drilldowns in SI and changing period if using R

  • 1.  Re drilldowns in SI and changing period if using R

    Posted 02-23-2015 14:47
    Re drilldowns in SI and changing period if using Report Designer Add-in - can people only using the report VIEWER change the period if you have it in a cell in Excel, and can they drill down?


  • 2.  RE: Re drilldowns in SI and changing period if using R

    Posted 02-25-2015 10:52
    Yes


  • 3.  RE: Re drilldowns in SI and changing period if using R

    Posted 02-25-2015 11:03
    Thanks @LouWagner !