  • 1.  Project: upgrade from 2016 Std to 2018 Adv. In a

    Posted 03-07-2018 14:40
      |   view attached
    Project: upgrade from 2016 Std to 2018 Adv. In a nutshell, the client wants to start and end on their current production server. The procedure they are looking at is is: 1. Install 2018 on a VM on a separate physical server, migrate, test, and Go Live. 2. Wipe the original server, make it a VM server, and move the 2018 VM back to that box. Ideally, step 2 is transparent to the Sage 100 environment (i.e. no installation, workstation setup, etc) will be necessary. Does this procedure make sense and look workable?


  • 2.  RE: Project: upgrade from 2016 Std to 2018 Adv. In a

    Posted 03-07-2018 17:52
    Yes, that makes sense, though I'll usually copy 2016 to the 2018 VM and migrate from the copy. That way I never disrupt the original 2016 install (in case things go south). Once 2018 is 'live', then you can wipe the old server, load ESX/HyperV/etc and move that 2018 VM, just like you said.


  • 3.  RE: Project: upgrade from 2016 Std to 2018 Adv. In a

    Posted 03-08-2018 08:10
    Thanks for the confirmation @SteveIwanowski . I also migrate from a copy. I always like to leave the original install intact.