I have a client who is having some issues with material issues not posting properly to work tickets although it does post to the G/L correctly. Most of the ones I have seen so far are the result of a duplicated issue followed by a correction to remove the duplication. I've looked under the hood with DFDM and can identify the discrepancies. Basically the Widget X is applied for 20 units, the accidentally issued another 20 units. A correction is posted to remove the 20 and then the work ticket shows that 0 have been issued.
Using DFDM I found what to correct in in work ticket header, work ticket detail, work ticket step and have fixed the numbers for units and material costs. However, when we do a WIP reconciliation report these fixes are not reflected. So far I have been unable to identify where the material costs below are being pulled from.
DFDM for the work ticket header shows the correct number, but the report does not.
Anyone have a clue as to where the WIP reconciliation report gets its number from?


------------------------------
Thomas Rogers (TomTarget)
Target System Technology, Inc.
------------------------------