Just an FYI, for Production Management, version 2022, if you want the quantity received at the received cost during PO ROGS, then dynamic materials must be checked in the PM Options. Otherwise, the item will be on the WT when linked, however will require a manual material issue and the inventory cost will be the cost from the inventory module vs. the specific PO cost. This is different than the previous versions of PM and documentation does not spell this out.
------------------------------
[Michele] [Herzog] [CPA,CITP, CGMA]
[Overland Park] [KS]
[816-520-1365]
------------------------------