Hi All, I am working with a client that does injection molding. They apply overhead based on the amount of resin used in the product. They go through several levels of production steps and the resin is only in the very first sub assembly that is created. I am struggling to figure out how to get this to work within PM since it is limited to a single component within the BOMs and labor times is often longer for smaller items so that would skew the amount applied.
Any thoughts/suggestions would be appreciated.
------------------------------
Bob Osborn
Consultant
ACI Consulting
------------------------------