MAS 4.50 SageCRM 7.1 - what's the order in upgrading?
The sage training on upgrading to MAS 4.50 and SageCRM to 7.1 is unclear on whether you HAVE to do them both at the same time,
or whether you can upgrade MAS 50 4.50 and leave CRM on 6.2 or 7.0 for a while.
Or if you can upgrade SageCRM to 7.10 while MAS is on 4.4, then upgrade MAS later.
Any SAGECRM experts have the details?