  • 1.  Landed Cost pre-load

    Posted 12-04-2019 19:56
    Asking for a client with Sage 100 v2018 Advanced.  Is there any way to pre-load information into landed cost entry in PO ROG?  We don't want to rely on receiving to make the entries required.  The PO entry person could put in the landed cost info in advance, but it needs to get to ROG.  Any ideas or solutions out there?

    ------------------------------
    Jon Parkinson
    Timac Business Systems
    ------------------------------


  • 2.  RE: Landed Cost pre-load

    Posted 12-05-2019 09:17
    A script is possible... reference thread on SC:
    Link.

    ------------------------------
    Kevin Moyes
    Technical Systems Analyst
    Munjal White Consulting Co.