Sage 100

 View Only
  • 1.  Job Cost Posting future period

    Posted 09-15-2020 10:37
    I have searched Sage portal, with no luck, other than that have not searched a whole lot for an answer. The client is on v2019.2 with PM Adv. They only have a few people that can post entries to JC and a couple of them are getting this message - The J/C Accounting Date (9/9/2020) does not fall within the Current and One Future Period for the module (7/1/2020 to 8/31/2020).  Do you want to override?

    Now the period the module is in is Sept 2020 and they were logged in with system date 9/9 and get the message. So they should not even be getting the message. Is there a flag to turn off somewhere?


    ------------------------------
    Kelly Sappington
    DeRosa Mangold Consulting -Sr. Implementation Specialist
    Elkhart IN
    254-265-6736
    ------------------------------


  • 2.  RE: Job Cost Posting future period

    Posted 09-15-2020 10:40
    That looks like the regular Company Maintenance setting.


    ------------------------------
    Kevin Moyes
    Technical Systems Analyst
    Munjal White Consulting Co.
    Toronto ON
    ------------------------------



  • 3.  RE: Job Cost Posting future period

    Posted 09-15-2020 11:53
    There is also a setting in Role Maintenance/Security Tab/Library Master.  It controls the Accounting Date.  


    ------------------------------
    Nancy Hanson
    Blytheco LLC
    Eagan MN
    ------------------------------



  • 4.  RE: Job Cost Posting future period

    Posted 09-15-2020 14:43
    Yes you guys are doing exactly what I did. Company maintenence defines to post to one future period and role maintenance can give user the ability to go past that. However the period end is Sept and they are trying to post to Sept logged with system date Sept.

    ---------------------------------
    Kelly Sappington
    DeRosa Mangold Consulting -Sr. Implementation Specialist
    Elkhart IN
    254-265-6736
    ---------------------------------





  • 5.  RE: Job Cost Posting future period

    Posted 09-15-2020 14:48
    Is the GL closed up to the same period?

    ------------------------------
    Kevin Moyes
    Technical Systems Analyst
    Munjal White Consulting Co.
    Toronto ON
    ------------------------------



  • 6.  RE: Job Cost Posting future period

    Posted 09-15-2020 15:10
    I will have to double check that.

    ---------------------------------
    Kelly Sappington
    DeRosa Mangold Consulting -Sr. Implementation Specialist
    Elkhart IN
    254-265-6736
    ---------------------------------





  • 7.  RE: Job Cost Posting future period

    Posted 09-16-2020 11:15
    Edited by Brett Zimmerman 09-16-2020 11:17
    It appears this is resolved with PU3 (and kb is below):

    Error: "Record: J/Cxxx is missing from SY0CTL.SOA" followed by "Error 11 SWVDTE 0520" no longer occurs when accessing Job Cost Tasks when 'Restrict Accounting Date to Current and One Future Period' is enabled in Company Maintenance and 'Allow Accounting Date Beyond One Future Date' is unchecked for the users Role in Role Maintenance.
    DevID 111506 Knowledgebase ID 101930

    Error: "Record: J/Cxxx is missing from SY0CTL.SOA" or "Error 11 SWVDTE 0520" or "The J/C Accounting Date (MM/DD/YYYY) does not fall within the Current and One Future Period for the module" when accessing Job Cost tasks

    Products
    Sage 100 2019
    Sage 100 2018
    Sage 100

    Country
    North America

    Description
    <content>
    • Record: J/Cxxx is missing from SY0CTL.SOA
    • Error 11 SWVDTE 0520
    • The J/C Accounting Date (MM/DD/YYYY) does not fall within the Current and One Future Period for the module
    • Changing the Current Fiscal Year or Current Period in J/C Options has no affect on the Date appearing in the message. The date in message comes from the SY0CTL.soa file for the J/C parameters.
    </content>

    Disclaimer
    Backup Warning

    Use caution when working with the below product functionality. Always create a backup of your data before proceeding with advanced solutions. If necessary, seek the assistance of a qualified Sage business partner, network administrator, or Sage customer support analyst.

    Cause
    <content>

    Issue occurs when 'Restrict Accounting Date to Current and One Future Period' is enabled in Company Maintenance and 'Allow Accounting Date Beyond One Future Date' is unchecked for the users Role in Role Maintenance.

    </content>

    Resolution
    <content>
    • Engineering is currently researching
    • Disable 'Restrict Accounting Date to Current and One Future Period' in Company Maintenance
    </content>

    Need help?
    Chat with support

    Additional information
    <content>
    Solution scheduled to be released in next product update PU3 for version 2019 (6.10.3.0) DE:111506
    </content>

    Category
    Batches, entries, posting
    Configuration
    Processing
    Security

    Defect ID
    <content>111454, 111506 (6.10.3)</content>



    ID:101930Last modified:05-13-2020  

    ------------------------------
    Brett Zimmerman
    Net at Work
    Greater Boston Area
    ------------------------------



  • 8.  RE: Job Cost Posting future period

    Posted 09-16-2020 11:27
    Thanks @Brett Zimmerman. PM will not have an update 3. So I will have to see if we can disable or check for users in Role Maintenance.​

    ------------------------------
    Kelly Sappington
    DeRosa Mangold Consulting -Sr. Implementation Specialist
    Elkhart IN
    254-265-6736
    ------------------------------



  • 9.  RE: Job Cost Posting future period

    Posted 09-16-2020 11:53
    Another option is maybe to provide the applicable user(s) with an 'Override' logon for them to enter as prompted/needed.  For example, maybe create a new 'override' logon in User Maint and assign a new 'override' Role that just contains the enabled 'Allow Accounting Date...' setting.

    ------------------------------
    Brett Zimmerman
    Net at Work
    Greater Boston Area
    ------------------------------