I got a call from a SAGE 100 orphan EU. Running SAGE 100 STD version 4.50.7. They closed the Inventory module for November 2016, but forgot to run and post the Physical Inventory Variance Register as of 11/30/16. The Inventory module is currently in Period 12, Year 2016. Can I manually change the Inventory Period back to Period 11, run, verify the Physical Count Variance Register with a 11/30/2016 date, and Post? Will the Inventory reports ""catch up"" at the end of December 31, 2016 so they can continue on with their standard procedure of performing a Physical Count each month?