Sage 100

 View Only
Expand all | Collapse all

Heads up on a problem with JOB-OPS in version 4.40

  • 1.  Heads up on a problem with JOB-OPS in version 4.40

    Posted 04-20-2012 06:43
    Heads up on a problem with JOB-OPS in version 4.40: Promise Date on parts is not assigned to the modified Production Start Date if modified multiple times without exiting the work ticket. We just received and tested a fix today.


  • 2.  RE: Heads up on a problem with JOB-OPS in version 4.40

    Posted 04-22-2012 17:50
    Was this happening on the R3 version after Nanook?


  • 3.  RE: Heads up on a problem with JOB-OPS in version 4.40

    Posted 04-23-2012 06:17
    Yes