I have 'wished' for this when a client is using both BOM production entries (with /Misc Charges) and JobOps Templates that have a /Misc Items. That way, when they ""make"" the item with a Production Entry, it captures the same costs as when they ""make"" an item with a JobOps Work Ticket. It would be nice to have a way to have a /MISC Charge match costs to a 'matching' /Misc Item.