Sage 100

 View Only

Cannot import to existing Production Management Work Ticket Step

  • 1.  Cannot import to existing Production Management Work Ticket Step

    Posted 05-26-2025 11:13

    I'm trying to import to existing work ticket steps 000000 in Production Management.  I need to do so because the WO>PM conversion did not update the WO UDI1 field to the PM UDI1 field.  The VI job doesn't allow me to import to an existing work ticket step.  Is there something I can modify in the DD to allow this?  



    ------------------------------
    Jane Scanlan
    Partner
    Next Level Manufacturing Consulting Group
    ------------------------------