I'm trying to import to existing work ticket steps 000000 in Production Management. I need to do so because the WO>PM conversion did not update the WO UDI1 field to the PM UDI1 field. The VI job doesn't allow me to import to an existing work ticket step. Is there something I can modify in the DD to allow this?

------------------------------
Jane Scanlan
Partner
Next Level Manufacturing Consulting Group
------------------------------