I have a client that is looking for an enhancement to BOM for kit items. They make assemblies with rope. They are looking for functionally like an option bill, where the option would be the length of rope used in it (which could be different every time). They want to be able to specify the length rather than having it setup in advance. They also want to be able to add a charge code to the kit bill.
Does anyone know if anything like this exists?
------------------------------
Bob Osborn
Senior Consultant
DSD
7142645278
------------------------------